Written by: Opinder Liddar
As architects, we understand that sticking to a budget can be challenging. There are plenty of stories in the media and on design shows about building projects that go far over budget and beyond schedule. But you rarely hear about the projects that come in on time and within budget, perhaps because they don’t make for exciting TV.
At lapd architects, we aim to be clear about realistic budgets and actual costs. And it’s true: enlisting the help of an architect can save you money in the long term. Through our work on shows like Build It Live and during consultations with clients, we often hear about projects where costs have exceeded the original budget. Sometimes, a client will bring us in to help manage and “fix” a mistake.
To help, we’ve set out some good housekeeping approaches that you and your designer can adopt from the outset of your project to keep it affordable and avoid budget dramas.
Define realistic expectations:
Sometimes, our self-build expectations can far outweigh what we can afford.
At your initial meeting with your potential designer, it is crucial that your aspirations are understood and that you receive a rough estimate of the cost for the matching design. If your dreams far exceed your budget, you need a sensible conversation with your designer to manage expectations and to explore what can be achieved within your financial planning. For example, there are ways in which costs can be reduced through different procurement options i.e. how the project will be managed either by a main contractor, project manager or if you will direct the project.
At lapd architects, we consider different options for clients and will often discuss the phasing of projects or the delay of fitting out particular areas of a project as money becomes available for clients over time. This is better than killing a dream outright. So long as you and your designer are realistic and can set out a workable master plan, there are ways for you to get closer to the Rolls Royce dream with some compromise or perhaps by taking longer to complete your project.
What is the Budget?:
I have many conversations with self-builders at Build It Live events who come for advice about their project costs because neither the designer nor the clients have mentioned a budget at the outset of a project. I see lots of lovely designs for houses or extensions where the homeowner has found that after going out to tender, the costs are twice or even three times what they can afford. This is the result of misguided priorities and poor communication.
When the realisation of a mismatch between plans and budget occurs later in a project, a lot of time has been lost; this could be at least 8 months by this point if planning was relatively simple or more than a year if it was complicated. Many emotions have been invested in a project by this point. And it is soul-destroying to have to tell anyone that they need to start again, go back to planning and look at something far simpler than the original design.
Therefore, be very clear about your budget and test your design regularly at the concept design stage, and certainly before planning, to check that it is still within budget. There is no point in having a set of nice drawings for an amazing home that you can’t afford.
Design review:
Once you have a design, you have something tangible that you can start to measure and use to calculate actual costs. At lapd architects we use an up-to-date £/sqm rate or a pricing package/cost plan service that many contractors use to set out a cost plan for our designs. The programme is linked to updated libraries for costs on materials, plant and even labour. By entering actual areas and dimensions of the proposed design, the programme will give you a fair estimation of what your building is likely to cost. We can show clients what we expect their new home will cost on a self-build basis or if they were to appoint a main contractor to do all the work. This is also useful to determine which elements the client may want to undertake themselves if they are looking at a mixed approach between self-build and main contractor.
It is crucial that, once you have a design, you ensure that a cost check is carried out. Once you submit a planning application, it’s going to be hard to make significant alterations without having to go through this arduous process again. There are cost plan services available from builders’ merchants, or you can use Build It’s cost estimating service to check your designs. I would certainly recommend that you do this before you commit to making your planning application.
Changes:
Even after a cost plan has been done, you should regularly check that your design is meeting the budget at regular intervals, as it is very easy for the scope of work to increase. This is sometimes called ‘project creep’. Post-planning, we usually start the detailed technical or construction drawing stage of the project. The assumptions made at concept design need to be carried through into this stage. It is surprising how the specification can change during this stage if clients aren’t reminded of the associated costs.
If you have a cost plan for your project, you will see that significant costs come from the kitchen, bathrooms, floor finishes, electric and heating systems you choose. So, no matter how much smaller you make the plan of your building, the costs associated with these items rarely significantly alter in proportion to the size of the property.
If you have chosen well, your designer and contractor will be trying their utmost to keep your costs down, and it’s important that you work with them to help you achieve your dream. If they are busy working on how to simplify construction details and procure cost-effective materials, there’s no point in you spending a fortune on a designer kitchen or sanitary ware too undo the budgeting going on elsewhere in your project.
Material cost fluctuation:
It wasn’t that long ago that we saw a cost increase in materials once or twice a year, and self-builders or contractors had time to buy before the price increase kicked in. Since Brexit, the pandemic and the war in Ukraine, prices for many materials sometimes increase on a monthly basis. In the height of price panics, steel quotes were valid for just 24 hours, such was the volatility in pricing. You need to consider when you are going to carry out the work on site. If you believe this will be in a year’s time it wouldn’t surprise me to hear that you need to allow for at least a 5% increase in all pricing. If you are sure your project is definitely going to happen, you could pre-empt price shocks by bulk buying materials early, so long as you have the space to store them securely.
Decent information:
Building your own home or extending your house will be one of the most expensive things you will ever do, so surround yourself with a team that will help you achieve a great result which is worthy of your investment. Great design will be realised if the detailing and technical information have been carefully thought through. Where this has not been done and contractors are working from planning drawings or incomplete information, there are likely to be adverse cost implications. Building Regulations are so detailed and onerous these days that you can rarely leave a contractor to just get on and do things as they always have done in the past. If the Building Inspector finds that your thermal performance or air tightness etc., is not up to scratch, it’s going to be expensive to put that right. Invest in getting this aspect of your project right the first time to save you time and money on site.
Suppliers of key materials are likely to issue measured drawings and/or detailed quotes about your project and the suitability of their goods for your project. They often expect you to review these and make comments upon them. Make sure that you understand with whom the liability for the suitability of the materials lies. A supplier should take responsibility for this, where they have recommended a product for your project; however, make sure that you do read the information provided to prevent costly issues on site. The supply of windows is notoriously challenging, and costs can exceed budgets, particularly when measurements have not been taken in situ and items arrive on site that won’t fit the openings in the building. I would suggest that you ensure that site measurements are taken by the supplier before the manufacture of these very expensive items, or else ensure that your site work to create the openings is highly accurate, and you have allowed tolerances which ensure there is sufficient space to fit windows and final finishes.
If changes are made to your project, the information required to support them can change rapidly. This information must be shared with everyone involved in the project. The last thing you want is products or work carried out based on an old version of drawings. I would suggest that you always have a full-sized set of up-to-date drawings on site and an online sharing platform where electronic versions of the latest drawings are maintained.
Programme and on-site changes
Aim to agree a programme of works with your contractor or project manager and sub-contractors and stick to it. Building a new house or carrying out a large extension could take at least 9 to 12 months on site. In addition to this, many elements of your build require lead-in times, such as your timber frame or windows, which can take months to realise.
If you have appointed the right designer, concept design is the point at which you should be exploring options and changes to the design, not when it is on site. If you make changes on site, it is likely that your schedule is going to be affected, which starts to cause cost issues, as suddenly some of the subcontractors that were lined up to attend on specific dates will be working on other jobs when you ultimately need them. You will start to wait for these subcontractors to come bac,k or you may have to accept higher costs from somebody else to complete the works to get your project back on programme. On-site changes are those most likely to break a budget and are something to avoid if at all possible. Some main contractors have told me they would pay the client so long as they didn’t change anything on site.
You need to work out a programme for all of your trades which sets out “critical path” items and allows some leeway should things not happen exactly as planned. This means organising the key trades to ensure that works happen in sequence e.g. your foundations need to be installed before your timber frame arrives. Some elements have more capacity for flex in your programme than others, such as external cladding or decorating. However, if there is a delay in an item on your critical path, the entire project is delayed which adds costs. Aim to keep all of your critical path items on track and regularly check the timely delivery of these items.
Try not to interfere with contractors or sub-contractors when they are on site and carrying out the agreed scope of work. Just because they happen to be there does not mean that they will take on additional work at no extra cost. You may think that by trying to get them to do a few more odd jobs whilst they are there is not going to cost you much more, but you will be surprised at what a contractor will remember you asking them to do and the costs they will charge you for doing it.
Conclusion:
Sticking to a budget can be made easier if you know exactly what programme you are working on. Following these key steps will mean that your build will more than likely be built to budget and will become a reality that will last a lifetime, but to achieve this, you have to be focused.
If you have a ‘day job’ or other commitments, then you may find that working with the right main contractor or project manager can help you keep your project programme and budget on track. If planned correctly and the right team is working with you, then your self-build project could be one of the greatest adventures of your life.