In the past, human development has paid little regard to biodiversity and the protection of habitats, resulting in a massive decline in a number of species. We are more aware of the human impact we have on the planet, and this has reflected in planning development and how we build in the UK.

Here, we’ll set out the impact that wildlife (particularly protected wildlife) have in the design, construction and planning application of your project. It considers what you need to be aware of and what provisions should be made to ensure that you and the wildlife around you co-exist. It describes common-sense measures that everyone can easily adopt and incorporate into their construction designs so that habitat provision for wildlife can be significantly increased.

Which species are protected?

Badgers, bats, birds, dormice, great crested news, natterjack toads, otters, reptiles, water voles and white clawed crayfish are amongst the species protected under legislation in England.

There are 18 different types of bats in the UK, and Pipistrelles are the most common. You’re breaking the law if you deliberately capture, injure or kill bats, damage or destroy a breeding or resting place, or obstruct access to their resting or sheltering places or recklessly disturb a bat while it’s in a structure or place of shelter or protection.

As a result, important to have regard for the rules and consider the impact on wildlife, especially bats, that your project may have.

When a protected species is likely to be on your development land, this can result in high costs. Providing surveys and reports can have a significant impact on project timescales and also increase costs.

Wildlife & Planning

Guidance is provided to local authority planning officers and committees about how they are to deal with planning applications that may affect a protected species. This guidance applies equally whether you are redeveloping a whole city block or adding a small extension to your home. This guidance requires you, the self-builder/homeowner, to employ an ecologist if it is ‘likely’ that protected species are on your site.

It used to be that these specialist consultants would be required for larger projects only. But this is now applied to proposals for minor schemes where budgets are already tight.

Often, specialists must be commissioned to provide detailed reports as part of planning applications. This means that applicants are required to make a significant investment before they can find out if their planning permission will even be granted.

A large developer may be able to afford these costs, but for an individual building their new home or extending their home, these costs are not viable.

Requirements to obtain specialist advice used to be made through planning conditions attached to planning application approval notices, but this is no longer the case. We are finding that guidance, which was once open to an exercise of discretion on a case-by-case basis, is often applied equally to all projects of all sizes, no matter the individual circumstances, and before a planning application can be made.

We are concerned that the blanket application of guidance has the potential to become counterproductive and can lead to unscrupulous actions on the part of applicants before planning applications are made. If there is a risk that specialist advice will be required, we are aware that some developers remove the issue before it becomes a problem. E.g they may remove trees before a planning application is submitted.

If this approach is allowed to continue, we fear it will inhibit housing development at all levels and will have a detrimental impact on the very species we wish to protect. We would prefer an approach which uses more of a carrot than a stick so that every project can produce  a positive outcome for wildlife and landowners alike.

A holistic approach needs to be implemented so that protected species (like bats and badgers) are there before development starts, have the highest level of protection, and appropriate mitigation measures are sensibly applied.

Wildlife & Planning

Guidance is provided to local authority planning officers and committees about how they are to deal with planning applications that may affect a protected species. This guidance applies equally whether you are redeveloping a whole city block or adding a small extension to your home. This guidance requires you, the self-builder/homeowner, to employ an ecologist if it is ‘likely’ that protected species are on your site.

It used to be that these specialist consultants would be required for larger projects only. But this is now applied to proposals for minor schemes where budgets are already tight.

Often, specialists must be commissioned to provide detailed reports as part of planning applications. This means that applicants are required to make a significant investment before they can find out if their planning permission will even be granted.

A large developer may be able to afford these costs, but for an individual building their new home or extending their home, these costs are not viable.

Requirements to obtain specialist advice used to be made through planning conditions attached to planning application approval notices, but this is no longer the case. We are finding that guidance, which was once open to an exercise of discretion on a case-by-case basis, is often applied equally to all projects of all sizes, no matter the individual circumstances, and before a planning application can be made.

We are concerned that the blanket application of guidance has the potential to become counterproductive and can lead to unscrupulous actions on the part of applicants before planning applications are made. If there is a risk that specialist advice will be required, we are aware that some developers remove the issue before it becomes a problem. E.g they may remove trees before a planning application is submitted.

If this approach is allowed to continue, we fear it will inhibit housing development at all levels and will have a detrimental impact on the very species we wish to protect. We would prefer an approach which uses more of a carrot than a stick so that every project can produce  a positive outcome for wildlife and landowners alike.

A holistic approach needs to be implemented so that protected species (like bats and badgers) are there before development starts, have the highest level of protection, and appropriate mitigation measures are sensibly applied.

Bats

In relation to bats, Natural England stated that “Construction, demolition, extension or conversion proposals could affect a bat roost in a building or barn” and advises local authority officers that:

You should ask for a survey where roosts are likely if the building or barn:

  • has little or no disturbance from artificial lighting
  • is close to woodland or water
  • has uneven roof tiles and large roof timbers
  • has cracks, crevices and small openings
  • has a roof that warms in the sun with a large roof space for flying
  • has hanging tiles or timber cladding on south-facing walls and has not be used for several years

From Natural England’s ‘Bats: Advice for making planning decisions’ 14 January 2022

The local planning authority’s ecology officer is often the person who will determine if the bat roosts are ‘likely’, but a notification to the planning authority from a neighbour who thinks they may have seen something on site can potentially trigger the requirement for an ecologist’s survey.

As Pipistrelle bats can be as small as a matchbox, a bat can occupy a very small space; a small opening which could accommodate a bat could exist on any building.

Once a developer has been asked to provide a bat survey, the process associated with this is likely to extend the time before a planning application can be made. The requirement to provide a bat survey effectively cuts the timeframe when you can make your planning application to less than half of the year.

Should you be required to carry out a survey, the window in which it can take place is between May and September. Recently, we have been advised that three surveys are needed for one application to be sure about the level of bat activity in the area.

The report usually takes a week or so to produce, and local authorities are asking that this be provided as part of the application.

A planning application should take 8 weeks to be determined, but in practice, this is becoming less the case these days because of the volume of information that planning officers have to get through to be able to determine an application.

The planning officer needs to consider many aspects, including the:

  • design
  • impact on neighbouring amenity
  • sustainable targets
  • highways access and parking
  • impact on trees
  • drainage proposals
  • likelihood of contamination
  • impact of Conversation Areas or Areas of Outstanding Natural Beauty (AONB)
  • Listed Building status and impact, if relevan,t and how it complies with national, local and neighbourhood planning policies.

 

Planning officers need to consider responses from the local parish council and anyone else who has commented on your application in order to make their decision. The bat survey is one further report that may need to be considered.

If you already know that the site has bats present and you have commissioned your report, then your application continues. But assume that you don’t know and during your application the local authority ecologist or your neighbour suggests that bats may be present, soa survey is now required. Your application cannot continue, and you may be asked to withdraw the application until the report is provided, without knowing at this point if the scheme is likely to be approved ot not.

If this situation arises from September onwards, you will find that you cannot submit your application until the surveys are don,e which may not be until May of the following year.

Natural England Licence

Assuming that you have had your survey done and managed to get planning approval, you will want to start work. However, if bats are present and the work affects where they are, you will need to get a bat licence from Natural England to be able to carry out the works.

The application again needs your own qualified ecologist to provide method statements and precise details of the works involved. Natural England says that the licences will be provided within 30 days, if they decide to grant one. As a lot of authorities have asked for surveys which have prompted the requirement for licences, Natural England this year were not able to provide licences in their stated timeframe.

Once you have your licence, there are only certain windows in which work can take place. Usually, you can’t carry out work when the bats are most active (summer) or hibernating (winter).

If you take into consideration when bat surveys can happen, how long the planning authority can take to determine your planning application, discharging your planning conditions, getting your Natural England licence and having a builder ready to start at the right time of year, you can see that it is likely that your project will be impacted.

Surveys can only be done when bats are active (April to September window), and you should also note that demolition can only take place when bats are active, but not during maternity periods, which may be in the early summertime.

Solutions

Ask your designer to look at introducing space for bats within your soffits and fascias for your new home or extension. As the insulation in your design sits inside the soffits, it would be easy to make this provision without it impacting the thermal envelope of your home.

On some schemes where a larger presence of bats has been found, we have been asked to provide a larger roof void for bats to inhabit. This can be done by providing a section of your roof with a small hole to the outside or providing space in outbuildings like sheds or garages. Just ensure that you keep these areas separate from your living space, and you and your wildlife will quite happily co-exist for years to come.

We often say that we would quite happily have added a bat box and bird box to every scheme we have ever designed. More often than not, a scheme where a bat survey is required results in a recommendation to add a bat box to the proposals. However, getting to this endpoint has usually cost the applicant a few thousand pounds, which could have been better spent providing 30 to 100 boxes in the surrounding area.

Instead, both local authority and private ecology consultants write reports detailing that bats are protected, documenting whether bats have been spotted or not, requiring that appropriate surveys must be carried out, and concluding that mitigation needs to be provided, usually in the form of a bat box. We’ve seen too many of these reports reaching the same conclusion and feel that the energy and money that goes into them could be better used to make a difference. We suggest an alternative approach be found.

In times gone by, we would be able to talk to a planning officer before a planning application was made and openly discuss design options for sites. A constructive dialogue would evolve, leading ultimately to a successful scheme. National planning policies expressly encourage dialogue and pre-application discussions with the local planning authority; however, in a lot of cases, we’re finding planners are increasingly reluctant to talk about what is achievable and focus instead upon a long list of issues that the applicant (the self-builder) needs to address before a full application can be considered.

We need to develop a more appropriate arena for assessing planning applications so that once the security of an approval has been given, clients feel happy to provide further information. The protection of species is entirely appropriate, and it is often possible to anticipate what the good practice will be in any given set of circumstances through the use of experience and common sense.

Biodiversity Net Gain

Under the Environment Act 2021, all planning permissions that are granted in England (with a few exemptions) will be required to demonstrate that they will deliver at least 10% biodiversity net gain (BNG) from November 2023 (estimated date).

BNG aims to leave the natural environment in a measurably better state than it was before the development took place. We can see that more consultants are going to be required to attest to the requirements of these new regulations, and wonder if simpler measures might be used? Might applicants put forward their own suggestions for increasing biodiversity based upon guidance, and could this be reviewed by the local authority’s ecologist, who would be familiar with wildlife in that area?

We would recommend that anyone carrying out any building work should put up bat and bird boxes. If you are proposing a flat roof, incorporate a green sedum or wildflower garden as the finish. These are relatively low-maintenance and provide additional habitat. It is relatively simple to set aside areas of your garden for meadow flowers or grassland; even a few square metres per development would cumulatively make a difference if more people adopted this approach.

At lapd architects we focus on privately owned properties and very often work with self-builders, guiding them through a complicated journey to realise their own dream homes. We still believe that giving everyone the chance to build their own home should be as viable as buying a ready-made developer house.

However, this is an example of how the planning system seems increasingly geared to make this harder for self-builders, unless they have very deep pockets. Therefore, housing development is not a level playing field, and, in the interests of everyone, including protected species, this needs to be addressed.

Call us

We’re available to chat about your dream home any time Monday – Friday, 9am-5pm

01865 407722